claireleininger claireleininger
  • 14-04-2017
  • Social Studies
contestada

ECONOMICS: What analysis do economists use to determine if the benefits of a community project will outweigh the costs? A. cost-benefit analysis B. optional analysis C. principle-benefit analysis D. economic principle analysis

Relax

Respuesta :

6SAD6BOY6
6SAD6BOY6 6SAD6BOY6
  • 14-04-2017
Sometimes it's called benefit cost analysis.
Answer Link

Otras preguntas

At the end of a snow storm, Elijah saw there was a lot of snow on his front lawn. The temperature increased and the snow began to melt at a steady rate. There w
there are 81 students in green t-shirts and 54 in white t-shirts and 27 in orange t-shirts. the teacher is planning to arrange them in such a way that each row
Does anyone know about prevalence ratio interpretation? Need someone to please explain it.
The minimum resultant of two forces of 20N and 5N is:a) 10Nb) 5Nc) 20Nd) 25N​
Which statement best describes the Columbian Exchange?
O 3 1 point Select the correct symbol to compare the two numbers. 0.934 0 0.93
what changes have you noticed in social media
Leslie sold 2 1/2 dozen sweet rolls
3. The equation 4x + 16y = 36 is a true equation for a particular value of x. Explain why x + 4y = 9 is also true for the same value of x.
Please help meee ( please answer all )