kkgabby12 kkgabby12
  • 15-12-2021
  • Engineering
contestada

Engineers plan to develop a new drill for use on oil rigs.
What should the engineers do first in order to develop the
new drill

Relax

Respuesta :

Аноним Аноним
  • 15-12-2021

Answer:

Conduct research on features for a new drill

Explanation:

Follow instagrm at ➜ mvnnyvibes

Answer Link

Otras preguntas

what thoughts are in the middle section of the declaration of independence
Choose the sentence that is correct. A) We went too the store. B) He is too big for those pants! C) I had too doughnuts for breakfast. D) Do you want too co
is 2/5 greater than 0.55
A rectangular prism has a volume of 432 in. The height of the prism is 9 in. What are the dimensions of the base? What is the length and width included in this?
Dr. Muniz recorded the wind speed at various locations within two counties, Lincoln and Tyler. She then made line plots from these data. What is the degree of o
How did Charlemagne blend the traditions of Roman,German,and Christian
Why might adolescence be a stressful time for many teenagers?
The first step in deforestation in the Amazon is _______.
In both transverse and longitudinal waves, the energy of the wave travels through but the particles do not move permanently. True False
both PLEASE HELP!!!!!