contestada

A bucket that has a mass of 20 kg when filled with sand needs to be lifted to the top of a 10 meter tall building. You have a rope that has a mass of 0.4 kg/m that must be secured to the bucket. It takes 1 meter of rope to secure the bucket. Once the bucket reaches the top of the building it only has mass 16 kg because there was a hole in the bottom and sand was leaking out at a constant rate while it was being lifted to the top of the building.

Find the work done lifting the bucket (sand and rope) to the top of the building.

Relax

Respuesta :

Answer:

W=2001.24 newton meters

Caution: check units and arithmetic - I often make errors.

Step-by-step explanation:

Work is force times distance.

Denote height by h where h=0 is at ground level.

Denote the mass of the bucket and rope at height h by m(h).

The rate at which the bucket loses mass with height is (20-16)/10=0.4 kg/m

The rate at which the rope between the bucket and the top of the building loses mass is 0.4 kg/m

The initial mass of the bucket and rope is

[tex]m_{0}=20+0.4+0.4(10)=24.4[/tex]

The mass at height h is

[tex]m(h)=24.4-0.8h[/tex]

The force required at height h is

m(h)g

where g is the gravitational acceleration.

g=9.81 meters/sec/sec

The work required is

[tex]\int\limits^b_a {m(h)g} \, dh[/tex]

Where a=0 and b=10

[tex]g\int\limits^b_a {(24.4-0.8h)} \, dh=g(24.4h-0.4h^2)\left \{ {{10} \atop {0}} \right.[/tex]

g(244-40)=204g

W=2001.24 newton meters

Otras preguntas