Answer:
$8.75 per hour
Explanation:
The computation of the predetermined overhead rate is shown below:
Predetermined overhead rate = Estimated factory overhead cost Ă· estimated direct labor hours
= $1,400,000 Ă· 160,000 hours
= $8.75 per hour
By dividing the Estimated factory overhead cost with the estimated direct labor hours we can get the predetermined overhead rate