
Respuesta :
Answer:
subsidence  of the soil = 0.85 meter
Explanation:
given data Â
clay layer thickness T = Â 5 m
porosity = 50%
water level = 1.5 m
porosity reduced = 40%
solution
first we get here initial void ratio that is express as
void ratio e = [tex]\frac{n}{1-n}[/tex] Â ................1
here n is porosity
e1 Â = [tex]\frac{0.5}{1-0.5}[/tex] Â
e1 = 1
and Â
when water level rise 1.5 m than void ratio e will be
e2 Â = [tex]\frac{0.40}{1-0.40}[/tex]
e2 Â = 0.66
and now subsidence will be
subsidence = T × [tex]\frac{e1-e2}{e1+1}[/tex] Â
subsidence = 5 × [tex]\frac{1-0.66}{1+1}[/tex]
subsidence  of the soil = 0.85 meter