Answer:
a. The process flowchart for the processes is shown in the attached file.
b. The flow time is 50 minutes.
c. It will increase the flow time to 57.5 minutes.
Explanation:
a. A process flowchart is used to show all the necessary steps and processes in an operation. The flowchart for the operation above is shown in the attached file.
b. Â Because F1 contains the critical path, the flow time is 50 minutes.
c. Because 50% of F1 is turned back to A, thus 100% of F1 will use approximately 15 mins in A and other 50% will use an additional 15 mins in A. Therefore:
On average F1 will use 15 + (50/100)*15 = 15 + 7.5 = 22.5 mins
This shows that Activity A will use an additional 7.5 mins. Because this is on the critical path, the flow time will change to 50 + 7.5 = 57.5 mins