jrodriguez245 jrodriguez245
  • 12-12-2019
  • Mathematics
contestada

a construction crew must build 4 miles of road in one week.
on Monday, they build 1/2 miles of road. on Tuesday, they build 1/3 miles of road.
how many more miles of road are left to build

Relax

Respuesta :

wdwaddy567
wdwaddy567 wdwaddy567
  • 12-12-2019
3 1/6 because 1/2+1/3 is 5/6 and 4- 5/6 is 3 1/6
Answer Link

Otras preguntas

In what two ways did the passing of the Intolerable Acts spur the American Revolution?
(NEED HELP ASAP!) Add: (1+7x^3-x^2)+(x^3+2+2x^2) express the answer in standard form
Which answer choice correctly describes a chemical bond? a force that holds atoms together in a fixed yet flexible structure a force that holds atoms togethe
Change 3/20 into a percentage
How much did the temperature change between 10 a. m. and 1 p.m. ?
what is the chemical structure of methane?
Above 882°c, titanium has a bcc crystal structure, with a = 0.332 nm. Below this temperature, titanium has a hcp structure, with a = 0.2978 nm and c = 0.4735 nm
Help with math homework pls! NO WRONG ANSWERS!!1!
Perimeter of a rectangle with s length of 7.5 m and the width of 4 m
Solve each inequality and graph it’s solution set. -9-e>3e+11