Respuesta :
Answer:
The EAC for Tachron 1 is -$86567.97  and The EAC for Techron 11 is  -$81293.85
Explanation:
      Techron I                    PV Factor       PV
      Cost             -2,10,000       1          -210000.00
1to3  Tas saving On Dep   23,800       2.577        61334.91
       (210000/3)*.34
1to3 pretax operating costs  -34980     2.577     -90146.85
        = -53000*(1-0.34)
3 Salvage value          19800      0.7938       15717.88
     30000*.66
NPV Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â -223094.07
EAC = -86567.97/2.577 Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â -86567.97
Therefore, The EAC for Tachron 1 is -$86567.97
Techron II                             PV Factor            PV
Cost               -370,000           1            -370000
1to3 Tas saving On Dep    25,160          3.993        100456.58
     (370000/5)*.34
1to3 pretax operating costs  -17160          3.993        -68514.9
    =-26000*(1-0.34)
3 Salvage value           19800         0.6806      13475.547
     30000*.66
NPV Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â -324582.8
EAC = -324582/3.993 Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â -81293.85
Therefore, The EAC for Techron 11 is  -$81293.85