Basketball86141 Basketball86141
  • 12-04-2024
  • Engineering
contestada

A partially worn cutting tool vb =0.2 mm is used to machine a steel bar (600 mm long 150 mm in diameter. the machine time took 8 minutes, while the expected life of the cutting tool is 15 . minutes at vb max. =0.75 mm - What is the expected amount of flank wear vb generated on the tool by the end of the operation?

Relax

Respuesta :

Otras preguntas

Could anyone please help me find k divided by 9 = 12 as well as 84n = 504 and 6 = m over 148? I need explanations...
How do I write the number in 2 other forms 0.632 and 4.293 ?
When the flooding waters of Nile receded what did they leave behind?
A jogger runs 4.0 km [W] in 0.50 h, then turns and runs 1.0 km [E] in 0.20 h, then 1.5 km [N] in 0.25 h, then 3.0 km [E] in 0.75 h and finally 1.5 km [S] in 0.3
What is 4.25 round to one decimal place
if a plane and a line (not in that plane) intersect, then the intersection is?
if I walked 9 miles in 2 hours how fast am I going?
what is 6*6*6*6 written in exponential notation
The problem is how many people must attend the third show so that the average attendance for three shows is 3000? And the other show attendance numbers are 2580
calculate the sum of 1/4 and 1/7