the article "uncertainty estimation in railway track life-cycle cost" (j. of rail and rapid transit, 2009) presented the following data on time to repair (min) a rail break in the high rail on a curved track of a certain railway line. a normal probability plot of the data shows a reasonably linear pattern, so it is plausible that the population distribution of repair time is at least approximately normal. the sample mean and standard deviation are 249.7 and 145.1, respectively.

Relax