A project has a critical path with a duration of 20 weeks and a standard deviation of 4 weeks. There is a 35% chance the project will be completed in x weeks or less. What is x? select the closest answer.

Relax

Respuesta :

Otras preguntas

All changes saved 3. Find the length of the segment indicated. Round to the nearest tenth if necessary. 5 3 5 X
Why was Akbar called the Mughal e Azam detailed answer
A man purchased a car for Rs.1,50,000. At what price was the car sold, if he suffered 10% loss on it.
What is the momentum of a tank with a mass of 3,500 kg and a velocity of 6 m/s?
c) Identify ONE specific pattern in the way in which colonized societies responded to imperialism.
the product of 3 and a number minus 10 is the same as four times the number
Corresponding Angles are congruent. Which angle corresponds with <4? 45 46 2728 <[?] 41 42 43/44
Help me French pls I don't understand
* Question 2 If a calculator is sold for $15.95, then the revenue in dollars, R, generated by this item is given by the formula R=15.959, where a represents the
¿CÓMO ALCANZÓ EL HOMBRE EL CONCEPTO DE INFINITO?